Build Your Own Power Station · Nationwide energy consultancy · Fully Funded Electrical & Structural Surveys · 0115 647 3822
0:34 · KMM YouTube · Dairy

Watch & Read: Make mooooo...ves in the right direction!

Dairy farm fun take with solar economics.

0:34 KMM YouTube More on this video →
Updated 2026-03-235 min readReviewed by Steve Moran

What this video covers

This is one of KMM's top-of-funnel short-form videos — a 60-second introduction to a topic worth understanding before you book a survey.

Dairy farm fun take with solar economics.

The dairy farm economics

  • Typical UK dairy farm electricity: 90,000–350,000 kWh/year for 80–250 head dairy operations
  • Load profile: bi-modal — milking parlour twice daily (5–6am and 4–5pm), continuous refrigeration overlay, ventilation
  • System sizing: 30–120kWp typical, often paired with 30–60kWh battery storage to time-shift solar into milking peaks
  • Diesel displacement: battery + solar can run diesel-pumped parlours from stored solar — typical 800–1,200L red diesel saved/year
  • Payback: 4.5–6 years pre-grant; faster with battery on time-shifted milking loads

How this applies to your project

If you're researching solar for your own home, farm, factory or commercial building, the principles in this video apply directly — but the specific numbers will vary based on your roof orientation, your import tariff, your half-hourly load profile and your tax position.

KMM's fully funded survey is the fastest way to translate this video into specific advice for your site. We:

  1. Run a desktop assessment from your MPAN and roof satellite imagery — inside 5 working days, no site visit needed at this stage
  2. Schedule a drone survey if the desktop assessment shows the project is viable — 3D model of your roof inside 48 hours
  3. Deliver a bound proposal with full ROI cash model, three finance routes side-by-side, and every commission disclosed
  4. Decide together — no hard sell, no time-pressured discounts, no deposit required to keep the quote open for 30 days

Related KMM pages

Commercial Solar · Sectors · Dairy Farms · Commercial Solar · Farms · Installations · Blog · Solar For United Kingdom Farms 2026

Subscribe for the next video

Steve and Kieren publish a new video on the KMM YouTube channel — Solar Made Simple every couple of weeks. Topics typically rotate through real customer install case studies, technical explainers, finance route walk-throughs, and tariff comparisons.

Book a fully funded survey to apply this to your project

Tell us your postcode, sector and current electricity spend — we will run a desktop assessment inside 5 working days. No deposit, no pressure.

Book Fully Funded Survey → 0115 647 3822
KMM bee Fully Funded Electrical & Structural Survey →