Build Your Own Power Station · Nationwide energy consultancy · Fully Funded Electrical & Structural Surveys · 0115 647 3822
7-document ZIP · Free download

DNO G99 Application: Template Pack

The actual document templates KMM uses for G99 commercial solar applications. Useful for in-house energy managers, consultants and contractors preparing their own submissions.

What's inside

  • Single Line Diagram template
    Editable SLD with inverter, generation source, protection settings and DNO interface
  • Protection settings table
    EREC G99 Issue 1 Amendment 8 settings for grid-frequency, vector-shift, anti-islanding
  • Witness testing schedule
    DNO-witnessed commissioning checklist with sign-off points
  • G100 export limitation specification
    When required and how to specify the CT clamp + control logic
  • Cover letter template
    DNO-region-specific letter pre-filled for NGED, Northern Powergrid, Western Power, UKPN
  • Connection offer review checklist
    What to scrutinise when the DNO returns the offer letter

Written by: Steve Moran & Kieren Myler, KMM Energy Solutions co-founders. Based on 5,000+ installs (team + network) across Australia and the UK. If you would rather not fill it in yourself, our grid connection consultancy handles the whole G99 application.

Download free

Enter your work email to receive the download link. Our G99 application guide explains what the DNO does with each part of it.

By submitting, you agree to our privacy policy.

Skip the guide — get a real proposal

If you are ready to discuss your specific commercial site, request a bound proposal instead — same writers, much more specific.

Request Commercial Quote → Call 0115 647 3822
WhatsApp KMM
KMM bee Contact us