Calculate the realistic bill saving and payback for your commercial site. We use £0.75/W as the base capex anchor and 12p/kWh as the SEG export rate — both real market figures we apply in our financial modelling. The output is a range, not a sales number. Your bespoke design follows the Fully Funded Electrical & Structural Survey.
Six inputs. Results update live. We never store this data — it stays in your browser.
Picking your sector pre-sets a sensible day-vs-night split. Tweak it below if you have your own number.
Usable, unshaded roof area in square metres. We assume roughly 6.5 m² per kWp installed.
Your site’s total annual electricity spend, all months combined. We use this to back out your effective grid rate; leave the default if you’re unsure.
Higher = more of your usage happens 9 a.m. to 5 p.m. when solar is generating. Pulled from your sector by default.
A battery typically lifts on-site self-consumption from ~78% to ~92% by storing excess for evening use.
Indicative capex — — bound to your bespoke design after the Fully Funded Electrical & Structural Survey.
This calculator is built on the same constants we use inside our commercial financial model, so the numbers you see here move in the same direction the real proposal will. We anchor the capex at £0.75 per watt — the all-in turnkey rate KMM is delivering on commercial roof-mounts at 100–1,000 kWp scale in 2026. We assume the UK average yield of 950 kWh per kWp per year, which holds up well from Cornwall to Carlisle once you factor in pitch and azimuth.
Self-consumption defaults to 78% without a battery and 92% with one, modulated by the day-vs-night slider so a 24/7 manufacturing site doesn’t get the same answer as a 9-to-5 office. We export the rest at 12p/kWh, which is a fair mid-market 2026 SEG tariff. The payback you see is the band of likely outcomes — roughly ±15% around our central estimate — with and without the 25% effective Year-1 capex relief that the Annual Investment Allowance gives a CT-paying limited company.
The calculator gives you the shape of the answer. The Fully Funded Electrical & Structural Survey gives you the bound, defensible answer your finance director can sign off against. It is fully funded by KMM — you pay nothing for the survey itself — and it adds four things this tool cannot:
The calculator is the shape. The Fully Funded Electrical & Structural Survey — fully funded by KMM — is the answer your board can sign off against.
Request your Fully Funded Survey →Calculator constants: £0.75/W capex anchor · 950 kWh/kWp/yr yield · 12p/kWh SEG export · 78% / 92% self-consumption (no batt / with batt) · 25% effective AIA Year-1 relief. Outputs are indicative only and bound to the Fully Funded Electrical & Structural Survey. © KMM Energy Solutions 2026.