Build Your Own Power Station · Nationwide energy consultancy · Fully Funded Electrical & Structural Surveys · 0115 647 3822
Commercial sector

Solar Panels for Warehouses

Distribution centre solar PV with export-limited G99 design. Big roofs, predictable load curves and grid-aware design that doesn't wait two years for capacity.

Domestic roof solar by KMM, Sleaford, Lincolnshire
KMM solar for warehouses install
Updated 6 July 20268 min readReviewed by Steve Moran

Quick Answer

  • Typical size: 150 kWp–1.5 MWp roof PV on large composite-clad spans
  • Typical project value: £105k–£900k installed (ex-VAT, before tax relief)
  • Year 1 saving: 30–55% off baseline electricity bill (cold-chain higher)
  • Payback: 3.8–5.4 years on capex; cold-storage with battery 3.0–4.2 years
  • Tax relief: Annual Investment Allowance (100% of qualifying spend in year 1, up to £1m a year), plus carbon-tendering eligibility
  • Lead time: 18–28 weeks incl. DNO G99 (G100 on most ≥300 kWp sites)

Warehouses and distribution centres have the easiest commercial solar economics in the UK. Roofs are large and clear, planning is routine PD, and the daytime electrical demand from picker trucks, conveyors and HVAC fits the solar generation curve almost perfectly. The bottleneck is rarely the building — it is the local grid.

Where the economics actually work

System sizes for warehouses

Most UK distribution centres can absorb 250kWp–1MWp+ on roof alone. iPort, Magna Park, Centre Parcs DC and similar large-shed sites routinely take 1.5–3MWp.

Grid is the constraint

Most warehouse rooftops in 2026 are grid-constrained. We design with G100 export limitation from day one, so your install gets approved in 8–12 weeks rather than waiting 12+ months for grid reinforcement.

Roof structure

Most warehouse roofs are steel portal with composite cladding rated 15kg/m² imposed load. Panels at 12–13 kg/m² with frame-bonded rails fit inside the design envelope.

Self-consumption

Warehouse self-consumption varies widely with shift pattern — your HH data audit establishes the real figure before we size anything.

Case in point. A 540kWp G99 export-limited install on a 12,000 m² Doncaster distribution centre completed in late 2025 generated 488,000 kWh in year 1, displaced 71% on-site at a tariff of 26p/kWh, and is on track for 5.4-year payback.

System sizes & typical project values

Pricing is bespoke per site — talk to our consultants. Get a tailored quote →

See all solar for warehouses cities we cover →

FAQs for solar for warehouses buyers

What if our warehouse is rented?
You will need landlord consent — typically straightforward for a tenanted warehouse where the system is owned by the operator. KMM provides a model landlord-consent letter.
How does G100 export limitation work in practice?
A small monitoring CT at your incomer reads real-time net export, and the inverter throttles output to keep export below a set threshold (often 0kW). On a typical weekday this rarely activates — your load consumes everything.
Will solar reduce my standing charge?
No — standing charges are fixed regardless of consumption. Solar reduces unit-rate import, which is normally 70–85% of your power bill.
On the KMM YouTube channel — Solar Made Simple

Watch real KMM solar for warehouses projects

Real warehouses installs from Steve and Kieren — case studies, install footage and economics in plain English.

All KMM videos →
📘 Buyer guides

Related guides for commercial buyers

Plain-English deep-dives on the topics that actually drive commercial solar decisions — written by KMM project managers, not marketing.

All blog posts →

Speak to a human

Quote a KMM solar for warehouses install

The form below goes straight to Steve or Kieren. No call-centre, no scripts. We respond to every enquiry 9-5, Monday to Friday.

Quote a KMM solar for warehouses install

Free drone survey, structural assessment and bound-in quote within 7 working days for solar for warehouses sites across the UK.

Responds in <2 hrs

Or
What happens next
  1. We respond to every enquiry 9-5, Monday to Friday.
  2. Free drone survey + structural assessment booked at your convenience — zero ladder access.
  3. A bespoke, bound-in proposal with payback maths, finance routes and the grant landscape mapped for your site.
MCS certifiedRECC readyTrustMark approvedCompanies House #146114295★ Trustpilot

Quote for solar for warehouses

Tell us about your roof, your bills and your goals. KMM runs a fully funded electrical & structural survey, designs a system, runs the numbers and tells you honestly whether solar makes sense for you. No deposit, no pressure.

Book a Site Survey → 0115 647 3822