Solar for UK Farms
Farm-specific solar PV, battery and farm-grant work. KMM has installed across arable, dairy, poultry, and mixed farms throughout the United Kingdom, Yorkshire, and Lincolnshire — drone-led, grant-aware (Improving Farm Productivity), BNG-compliant.
Quick Answer
- England farm solar grant: Improving Farm Productivity scheme — 25% contribution; grants of 25–40% available by UK nation
- Typical farm size: 50–500 kWp on grain stores, dairy parlours, machinery sheds
- Payback with grant support: 3.2–4.5 years (vs 4.2–6.0 unfunded)
- BNG / cross-compliance: ground-mount at 1.5m+ preserves Basic Farm Payment under sheep
- Continuous load benefit: dairy and poultry farms hit 75–90% self-consumption
- Lead time: 12–20 weeks; grant claim window runs from award
Your sector specifics
Real KMM installs
Every case study below is a real KMM customer with measured Year 1 generation, real payback maths and named project manager.
Doctors' Surgery Solar Rescue: 100kW + Battery Backup
A Market Deeping doctors' surgery had been let down by a previous solar installer — non-stop issues, no monitoring, zero confidence. KMM installed 100kW solar, 100kW battery, Tigo optimisers on every panel.
UK Farm Solar Case Study: 3-Year Payback
UK farm sized its solar at 50,000 kWh against 37,000 kWh usage to future-proof. KMM modelled a 3-year 3-month payback and roughly £500k of 30-year savings.
UK Farm Solar: Cutting Energy Costs on a Dryer
UK farm with grid-only power and a summer grain dryer turned to solar to harness rising energy costs, drive its dryer, and earn export income.
Domestic Solar: £180 to £65 a Month, 18 Months On
A real KMM domestic install revisited 18 months on. Monthly energy spend fell from around £180 to around £65, plus around £1,000 a year from grid export.
Watch real KMM customers
Hand-picked from our 78-video YouTube library — real installs, real surveys, real customer reviews.
Fully Funded Electrical & Structural Survey — tell us about your project
The form below goes straight to Steve or Kieren. No call-centre, no scripts. We respond to every enquiry 9-5, Monday to Friday.
Fully Funded Electrical & Structural Survey — tell us about your project
Drone survey, structural check, bound-in quote in 7 working days. No deposit.