Build Your Own Power Station · Nationwide energy consultancy · Fully Funded Electrical & Structural Surveys · 0115 647 3822
0:35 · KMM YouTube · Poultry

Watch & Read: Why Future Poultry Farms Will Run on Solar

Poultry sheds + ventilation + lighting = perfect solar match. KMM's poultry sector case made in 35 seconds.

0:35 KMM YouTube More on this video →
Updated 2026-05-135 min readReviewed by Steve Moran

What this video covers

This is one of KMM's top-of-funnel short-form videos — a 60-second introduction to a topic worth understanding before you book a survey.

Poultry sheds + ventilation + lighting = perfect solar match. KMM's poultry sector case made in 35 seconds.

The poultry farm economics

  • Typical UK poultry farm electricity: 80,000–250,000 kWh/year per layer or broiler unit
  • Self-consumption ratio: the highest in UK agriculture — typically 80–90% on broiler farms because ventilation, lighting and feed automation runs daytime
  • Typical KMM system size: 30–150kWp per shed
  • Payback: 4–6 years pre-grant on broiler operations; slightly longer on layer farms due to evening lighting cycles
  • Biosecurity: roof access procedures need to comply with AI/avian flu zoning rules — KMM works to defra-style biosecurity standards

How this applies to your project

If you're researching solar for your own home, farm, factory or commercial building, the principles in this video apply directly — but the specific numbers will vary based on your roof orientation, your import tariff, your half-hourly load profile and your tax position.

KMM's fully funded survey is the fastest way to translate this video into specific advice for your site. We:

  1. Run a desktop assessment from your MPAN and roof satellite imagery — inside 5 working days, no site visit needed at this stage
  2. Schedule a drone survey if the desktop assessment shows the project is viable — 3D model of your roof inside 48 hours
  3. Deliver a bound proposal with full ROI cash model, three finance routes side-by-side, and every commission disclosed
  4. Decide together — no hard sell, no time-pressured discounts, no deposit required to keep the quote open for 30 days

Related KMM pages

Commercial Solar · Farms · Commercial Solar · Sectors · Poultry Farms · Blog · Solar For United Kingdom Farms 2026 · United Kingdom Commercial Solar

Subscribe for the next video

Steve and Kieren publish a new video on the KMM YouTube channel — Solar Made Simple every couple of weeks. Topics typically rotate through real customer install case studies, technical explainers, finance route walk-throughs, and tariff comparisons.

Book a fully funded survey to apply this to your project

Tell us your postcode, sector and current electricity spend — we will run a desktop assessment inside 5 working days. No deposit, no pressure.

Book Fully Funded Survey → 0115 647 3822
KMM bee Fully Funded Electrical & Structural Survey →