Watch & Read: This UK Farmer Spends Β£3K/Month on Energyβ€”Here’s How Solar Will Fix It 🌞🚜

Jon’s on-site at a UK farm getting ready to install a 100kW solar systemβ€”and the numbers speak for themselves. πŸ’‘ πŸ”§ Current bill: Β£3,000/month πŸ’Έ Solar will cut that in HALF πŸ“ˆ ROI in year one: nearly 21% πŸ’° Payback in…

1:35 KMM YouTube More on this video β†’
Updated 2025-09-035 min readReviewed by Steve Moran

What this video covers

This is one of KMM's mid-funnel explainer videos β€” useful once you're past the basic 'should I get solar' question and into the how-does-it-work detail.

Jon’s on-site at a UK farm getting ready to install a 100kW solar systemβ€”and the numbers speak for themselves. πŸ’‘ πŸ”§ Current bill: Β£3,000/month πŸ’Έ Solar will cut that in HALF πŸ“ˆ ROI in year one: nearly 21% πŸ’° Payback in…

UK agricultural solar in 2026

  • UK farm electricity spending has risen by 122% since 2021 β€” solar PV is now the most cost-effective answer for most operations
  • Permitted Development covers roof PV on agricultural buildings under Class A of the General Permitted Development Order
  • Ground-mount above 9mΒ² requires planning permission and (for arrays above 30kWp) typically a Landscape and Visual Impact Assessment
  • Sheep-grazed ground-mount preserves Basic Farm Payment status on the affected parcel β€” KMM designs frames at 1.5m minimum height for this
  • The Lincolnshire Rural Business Grant awards up to Β£40,000 toward capital projects in rural and agricultural businesses across the county

How this applies to your project

If you're researching solar for your own home, farm, factory or commercial building, the principles in this video apply directly β€” but the specific numbers will vary based on your roof orientation, your import tariff, your half-hourly load profile and your tax position.

KMM's fully funded survey is the fastest way to translate this video into specific advice for your site. We:

  1. Run a desktop assessment from your MPAN and roof satellite imagery β€” inside 5 working days, no site visit needed at this stage
  2. Schedule a drone survey if the desktop assessment shows the project is viable β€” 3D model of your roof inside 48 hours
  3. Deliver a bound proposal with full ROI cash model, three finance routes side-by-side, and every commission disclosed
  4. Decide together β€” no hard sell, no time-pressured discounts, no deposit required to keep the quote open for 30 days

Related KMM pages

Commercial Solar Β· Farms Β· Cost Β· Grid Connections

Subscribe for the next video

Steve and Kieren publish a new video on the KMM YouTube channel β€” Solar Made Simple every couple of weeks. Topics typically rotate through real customer install case studies, technical explainers, finance route walk-throughs, and tariff comparisons.

Book a fully funded survey to apply this to your project

Tell us your postcode, sector and current electricity spend β€” we will run a desktop assessment inside 5 working days. No deposit, no pressure.

Book Fully Funded Survey β†’ 0115 647 3822