Build Your Own Power Station · Nationwide energy consultancy · Fully Funded Electrical & Structural Surveys · 0115 647 3822
0:27 · KMM YouTube · Agricultural

Watch & Read: This Farm Just Cut Its Energy Bills… From the Sky

Drone footage of a farm solar install — quick visual proof.

0:27 KMM YouTube More on this video →
Updated 2026-04-075 min readReviewed by Steve Moran

What this video covers

This is one of KMM's top-of-funnel short-form videos — a 60-second introduction to a topic worth understanding before you book a survey.

Drone footage of a farm solar install — quick visual proof.

UK agricultural solar in 2026

  • UK farm electricity spending has risen by 122% since 2021 — solar PV is now the most cost-effective answer for most operations
  • Permitted Development covers roof PV on agricultural buildings under Class A of the General Permitted Development Order
  • Ground-mount above 9m² requires planning permission and (for arrays above 30kWp) typically a Landscape and Visual Impact Assessment
  • Sheep-grazed ground-mount preserves Basic Farm Payment status on the affected parcel — KMM designs frames at 1.5m minimum height for this
  • The Lincolnshire Rural Business Grant awards up to £40,000 toward capital projects in rural and agricultural businesses across the county

How this applies to your project

If you're researching solar for your own home, farm, factory or commercial building, the principles in this video apply directly — but the specific numbers will vary based on your roof orientation, your import tariff, your half-hourly load profile and your tax position.

KMM's fully funded survey is the fastest way to translate this video into specific advice for your site. We:

  1. Run a desktop assessment from your MPAN and roof satellite imagery — inside 5 working days, no site visit needed at this stage
  2. Schedule a drone survey if the desktop assessment shows the project is viable — 3D model of your roof inside 48 hours
  3. Deliver a bound proposal with full ROI cash model, three finance routes side-by-side, and every commission disclosed
  4. Decide together — no hard sell, no time-pressured discounts, no deposit required to keep the quote open for 30 days

Related KMM pages

Commercial Solar · Farms · Drone Surveys · Installations

Subscribe for the next video

Steve and Kieren publish a new video on the KMM YouTube channel — Solar Made Simple every couple of weeks. Topics typically rotate through real customer install case studies, technical explainers, finance route walk-throughs, and tariff comparisons.

Book a fully funded survey to apply this to your project

Tell us your postcode, sector and current electricity spend — we will run a desktop assessment inside 5 working days. No deposit, no pressure.

Book Fully Funded Survey → 0115 647 3822
KMM bee Fully Funded Electrical & Structural Survey →