Build Your Own Power Station Β· Nationwide energy consultancy Β· Fully Funded Electrical & Structural Surveys Β· 0115 647 3822
1:45 Β· KMM YouTube Β· Dairy

Watch & Read: Dairy Farm Solar Done Right πŸ„βš‘ | Clean Install + Sigenergy Setup

Kieren’s back at a UK dairy farm, showing off what a proper solar install should look like. πŸ‘£ Walk through the system 🧼 Tidy, well-run cabling πŸ”‹ Featuring the sleek Sigenergy inverter + battery combo At KMM Energy,…

1:45 KMM YouTube More on this video β†’
Updated 2025-10-155 min readReviewed by Steve Moran

What this video covers

This is one of KMM's mid-funnel explainer videos β€” useful once you're past the basic 'should I get solar' question and into the how-does-it-work detail.

Kieren’s back at a UK dairy farm, showing off what a proper solar install should look like. πŸ‘£ Walk through the system 🧼 Tidy, well-run cabling πŸ”‹ Featuring the sleek Sigenergy inverter + battery combo At KMM Energy,…

The dairy farm economics

  • Typical UK dairy farm electricity: 90,000–350,000 kWh/year for 80–250 head dairy operations
  • Load profile: bi-modal β€” milking parlour twice daily (5–6am and 4–5pm), continuous refrigeration overlay, ventilation
  • System sizing: 30–120kWp typical, often paired with 30–60kWh battery storage to time-shift solar into milking peaks
  • Diesel displacement: battery + solar can run diesel-pumped parlours from stored solar β€” typical 800–1,200L red diesel saved/year
  • Payback: 4.5–6 years pre-grant; faster with battery on time-shifted milking loads

How this applies to your project

If you're researching solar for your own home, farm, factory or commercial building, the principles in this video apply directly β€” but the specific numbers will vary based on your roof orientation, your import tariff, your half-hourly load profile and your tax position.

KMM's fully funded survey is the fastest way to translate this video into specific advice for your site. We:

  1. Run a desktop assessment from your MPAN and roof satellite imagery β€” inside 5 working days, no site visit needed at this stage
  2. Schedule a drone survey if the desktop assessment shows the project is viable β€” 3D model of your roof inside 48 hours
  3. Deliver a bound proposal with full ROI cash model, three finance routes side-by-side, and every commission disclosed
  4. Decide together β€” no hard sell, no time-pressured discounts, no deposit required to keep the quote open for 30 days

Related KMM pages

Commercial Solar Β· Farms Β· Commercial Solar Β· Sectors Β· Dairy Farms Β· Battery Storage

Subscribe for the next video

Steve and Kieren publish a new video on the KMM YouTube channel β€” Solar Made Simple every couple of weeks. Topics typically rotate through real customer install case studies, technical explainers, finance route walk-throughs, and tariff comparisons.

Book a fully funded survey to apply this to your project

Tell us your postcode, sector and current electricity spend β€” we will run a desktop assessment inside 5 working days. No deposit, no pressure.

Book Fully Funded Survey β†’ 0115 647 3822
KMM bee Fully Funded Electrical & Structural Survey β†’