The Half-Hourly Data You Need Before Requesting a Solar Quote
Commercial solar quotes are wildly more accurate with half-hourly consumption data. Here is what HH data is, how to pull it, and what KMM does with it.

Why HH data matters
Most commercial solar quotes you receive in 2026 are built from annual kWh and sector rule-of-thumb assumptions. That approach gets within 25-40% of the right system size. Half-hourly consumption data — your actual electrical usage in 30-minute blocks across 12 months — gets within 3-5%. The difference matters because oversizing wastes capex on kWh that get exported at low SEG rates instead of self-consumed at full grid rate; undersizing leaves money on the table.
How to pull HH data
- Confirm you are HH-metered — most UK commercial sites above 100kW peak demand are mandatorily HH-metered. Your bill should say "HH" or "Half Hourly" somewhere.
- Request from your supplier — most large commercial suppliers (EDF Energy Business, npower Business, Drax, SSE Business, Engie) will email a CSV inside 48 hours of request.
- Alternative — your Meter Operator (MOP) — your MOP holds raw HH data and can release it. Your bill lists the MOP code.
- Let KMM pull it on your behalf — we have signed authority arrangements with most major commercial suppliers and can pull HH data inside a week.
What we model from HH data
- True annual self-consumption ratio for any proposed system size
- Battery sizing — exact capacity to lift self-consumption from baseline to 85%+
- Peak-shaving potential — DUoS/TNUoS reduction opportunity
- Time-of-use arbitrage if a relevant tariff is available
- Year-by-year cash model with realistic generation overlap (not averaged)
What if you don't have HH data
For smaller commercial sites that aren't HH-metered, we work from annual kWh and sector-typical load profiles. The sizing is less precise but within 8-15% of optimal for simple commercial operations. For complex operations (multi-shift, refrigeration, peak-driven), we strongly recommend a temporary clamp-meter logger for 4-6 weeks — costs around £200 and we credit it against your install.
Bottom line
If you can pull 12 months of HH data before your survey, do. It produces a materially better proposal. If you can't, that's fine — we have workarounds. But ask any installer giving you a commercial solar quote whether they've used your HH data or rule-of-thumb assumptions, and if they say rule of thumb, ask why.